Checking a delivery date in a quote against market conditions and your own design capacity
- Starting point
- A plant builder is calculating an assembly and test line with linear axes and control components. Sales has to name a delivery date before engineering has even seen the job. So far the estimator asks purchasing for lead times and the project manager for free design engineers, and the two answers arrive on different days.
- How Linetrack is used
- Perplexity is connected for the company as a remote connector on request, with access registered in advance at Linetrack. The estimator asks in one sentence for current lead times on the axes and controls and whether mechanical and electrical design have room in the planned period. Perplexity takes the first from web sources and the second from deadline and capacity planning in Linetrack. Purchasing checks the web sources before the commitment, as with any research.
- Result
- The delivery date in the quote rests on both sides at once, and design bottlenecks show up before the commitment rather than in the first project week. By default Perplexity only reads and changes nothing in the plan.

